Bedells
A thorough refurbishment of the Bedell Group’s Jersey office.
The refurbishment consisted of stripping out most of the internals of the ground floor areas and then liaising with and co-ordinating all sub contractors, as installation of the new fit out commenced.
We supplied and installed the following:
- The floor to ceiling acoustic glass partition system
- The suspended ceiling system
- The sprayed grey metal sound baffling slatted ceilings in the board rooms
We also locally manufactured the slatted walnut feature ceiling throughout the entire corridor.
Other work undertaken included the demolition of the dated client washroom facilities and the staff shower facilities and the replacement of more modern and spacious facilities.
As main contractor, we liaised with and co-ordinated all the trades involved, ensuring the desired high class finish was successfully achieved.